Overweight Dumpsters & Overage in Clermont, FL
Every rental has a weight allowance, and material over it is charged per ton over it. This page explains the allowance, which materials reach it fast, and how to stay under it.
Arrange a delivery
Mon-Fri 7:00 AM-10:00 PM ET | Sat 8:00 AM-10:00 PM ET | Sun 7:00 AM-9:00 PM ET
Call NowWhat the weight allowance is
Every dumpster rental has a weight allowance — the amount of material the rental covers, measured in tons. The allowance is set by the provider, and it varies by size and by job. Material up to the allowance is covered by the rental. Material over the allowance is charged per ton over it, and the provider explains the terms before the delivery is arranged.
The allowance matters because a container can be full by weight long before it is full by volume. A 20-yard of drywall and lumber is a light load, and it will be full by volume before it is anywhere near its allowance. A 20-yard of shingles is a heavy load, and it can reach its allowance when the container is only part full. A 10-yard of concrete is a heavy load on its own, and a 20-yard of concrete would go far over its allowance.
Ask the provider what the allowance covers before the job starts. The provider can explain the allowance for the size you are ordering, and match the size to the material. A roofing job needs a different conversation about weight than a garage cleanout, because the material is so much heavier.
Materials that reach the weight allowance fast
Eight materials where the weight matters more than the volume.
- Concrete slabs and chunks
- Brick and block
- Dirt and soil
- Tile and ceramic
- Asphalt and blacktop
- Roofing shingles
- Plaster and lath
- Stone and pavers
How to stay under the allowance
Keep heavy material in its own load. Concrete, brick, dirt, tile and shingles go in a 10-yard on their own, not mixed with light material. A mixed load runs out of weight and volume at once, and the container is over its allowance and half empty at the same time. Two loads are simpler than one mixed load.
Load the heavy material low and flat. Shingles tossed in from the roof land on top of each other and leave air gaps, and a container that looks full of shingles may still have room at the bottom. Load the shingles low and flat, and the container will hold more. Break concrete down into pieces, stack tile flat, and keep the load level with the rim.
A roofing load that went over its allowance
A roof tear-off in Clermont filled a 20-yard container only part full, because the shingles reached the weight allowance and the container could take no more.
The provider had explained the allowance before the job started, so the crew knew the limit and the second load was arranged before the work stopped.
What happens over the allowance
Material over the allowance is charged per ton over it. The provider weighs the container at the facility and works out how much is over, and the terms are explained before the delivery is arranged. The charge is per ton, so a small amount over is a small amount, and a large amount over is a large amount. The way to avoid it is to match the size and the load to the material before the job starts.
Tell the provider what the material is before the delivery is arranged. A roofing job, a concrete job, a dirt job and a cleanout job all have different weights, and the provider can match the size and the allowance to the job. A container ordered for the wrong material is a container that goes over its allowance.
Avoiding overage on your job
Four steps, from the first call to the pickup.
Tell the provider the material
Shingles, concrete, dirt, tile or household junk — the material decides the allowance.
Match the size to the material
Heavy material goes in a 10-yard on its own. Light material goes in a 20-yard or 30-yard.
Load low and flat
Keep heavy material low, stack flat material flat, and do not load above the rim.
Call before the container is full
If the load is heavier than expected, call before the container is full and the provider can arrange a second load.
Frequently asked questions
Answers from the questions Lake County homeowners actually ask.
Call NowThe amount of material the rental covers, measured in tons. Material up to the allowance is covered by the rental, and material over it is charged per ton over it.
Concrete, brick, dirt, tile, asphalt and roofing shingles. They are dense, so a small amount weighs a lot, and a container of them reaches the allowance fast.
Material over the weight allowance is charged per ton over it. The provider weighs the container at the facility and works out how much is over, and the terms are explained before the delivery is arranged.
Not for heavy material. A larger container of concrete or shingles reaches the allowance just as fast, because the allowance is about weight, not volume. Heavy material goes in a 10-yard on its own.
Call now and tell the provider what the material is. The provider matches the size and the allowance to the job before the delivery is arranged.
Need a dumpster in Clermont?
Call now — we will connect you with an independent local provider who delivers, places and picks up the container.
Call Now